David Johnson in-house counsel checklist plus integrated Tropical Haven field-photo brief

This build is self-contained and uses the actual project photos and maps you uploaded. No local photo paths are required for it to display correctly.

Immediate legal objective
Make NetFiber cleanly presentable as a Florida-authorized, portal-ready, evidence-backed applicant.
Built around your current facts: 391 homes passed, lit headend, 56 homes plug-and-play ready in Phase 1 North, and on-site ONU / router inventory.
At-a-glance
391
Homes passed
56
Ready homes
200
ONUs on site
130+
BOP score floor

Quick start guidance

Step 1

Fix legal posture first

David’s first move is Florida authority and identifier cleanup. Do not polish a submission while the entity stack is still vulnerable.

Step 2

Lock evidence next

Get dated headend, OSP, vault, materials, resident, and staging proof immediately. This version already gives a structure for most of it.

Step 3

Assemble filing binder

Once authority, identifiers, evidence, support letters, and budget tabs are complete, the package becomes submission-grade.

What this final version solves
  • Actual uploaded photos now populate because they are embedded directly in the file.
  • The page is mobile-optimized with hamburger navigation and light/dark mode.
  • The counsel workflow and visual brief are combined in one portal for David and James.
  • No external JS libraries are required for charts or interactions.

Integrated project visual brief

Aerial of Tropical Haven
Aerial community image supporting project scale and layout.

What is included here

  • Actual aerial/community image
  • Actual resident meeting photo
  • Actual trenching and construction photos
  • Actual reel and handhole/vault photos
  • Actual cold-room and rack photos
  • Actual duct plan and all FTTH phase plans

Funding split

$2.5M project total
Requested forward funding: $1.85M • already deployed / matched value: $650K

Cost breakdown

OSP Construction
$900,000
Fiber & Materials
$400,000
Electronics
$300,000
Labor
$500,000
Activation
$400,000

Adoption curve

Conservative 40% Moderate 60% Aggressive 85% 0 9 18 27 36 mo

Plans and maps

Duct plan
Duct plan for Tropical Haven.
Phase 1 plan
FTTH Phase 1 plan.
Phase 2 plan
FTTH Phase 2 plan.
Phase 3 plan
FTTH Phase 3 plan.
Master phased plan
Master phased plan.